Sunday, July 5, 2020
Leading Edge On Upper Right Wing, Varnishing Lower Left Wing
It's been a busy day. I worked on the Fly Baby first thing this morning while it was coolish at the airport. Then I came home and glued the leading edge to the Upper Right wing.
We mover the Lower Left wing to the tent in the driveway. I have to push the C-140 out the other end to be able to rotate the wing all the way around.
I started varnishing. I did all the areas I could do with a 2" brush, wing walk, spars, etc. I have an idea for getting into the gussets. I need to run to the hardware store.
I'm using just over 1 quart per coat per wing. I expect I'll be well over 2 gallons when I'm done with all for wings. I've got about 2 hours doing the easy bits.
Back to the airport to work on the Fly Baby this evening. It will be flying again soon.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment